For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have
received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all
cases we will try to accommodate your needs. In most cases we are able to do so.
Standard
GB, DIN, ISO, JIS
Size
M3-M50 or non-standard as request&design
Material
Carbon steel, stainless steel, alloys steel etc.
Hex head bolt and nut Grade
4.8 / 6.8 / 8.8 / 10.9 / 12.9 ,
A2-70 / A4-80
Packing
Box, carton or plastic bags, then put on pallets, or according to the demand of the customers
Standard
GB, DIN, BSW,UNC
Size
M3-M50 or non-standard as request&design
Material
Carbon steel, stainless steel, alloys steel etc.
Grade
4.8 / 8.8 / 10.9 / 12.9 ,
A2-70 / A4-80
Packing
Box, carton or plastic bags, then put on pallets, or according to the demand of the customers
Butterfly buckles and double ring buckles (also known as butterfly buckles, connecting rings, or linking rings) are mainly used to connect the chains, rings, and hooks in chain rigging. The design of this connecting ring allows for the pivot connection of a rotating ring body at each end of a connecting ring body. Its characteristic is that the body is a hollow cylindrical body, and the two rotating ring bodies are formed by a protruding embedded part at one end of a linear rod, and the other end is bent into a ring and then wound around a straight section for positioning.
Standard
GB, DIN, ISO, JIS
Size
M3-M50 or non-standard as request&design
Material
Carbon steel, stainless steel, alloys steel etc.
Hex head bolt and nut Grade
4.8 / 6.8 / 8.8 / 10.9 / 12.9 ,
A2-70 / A4-80
Packing
Box, carton or plastic bags, then put on pallets, or according to the demand of the customers
Materials:
Carbon steel, Stainless steel
Size:
Customized as per detailed sizes or drawings
MOQ:
1,000pcs above, depends on products or dimensions
Sample lead time:
3-7 working days mostly
Massive lead time:
10-15 working days mostly
Trade terms:
EXW/FOB/CIF/CNF/FCA/DAP/DDP/DDU
Package:
PE bags + brown carton + pallets or customized as demands
A bracket is a widely used support structure in various occasions, with diverse designs and materials that can meet different usage needs. Hardware brackets are usually made of metal materials such as stainless steel, aluminum alloy, etc., which have good durability and load-bearing capacity, ensuring the stability and safety of the bracket.