For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have
received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all
cases we will try to accommodate your needs. In most cases we are able to do so.
Structure of electric vehicle follow-up brake:
It mainly includes components such as brake box, two brake shoes, crank, reset spring, adjusting parts, tension column, etc. Specifically, the working principle of the follow-up brake is to increase the rotation angle of the two brake shoes during braking through the setting of metal plates and reels, thereby increasing the maximum braking resistance. This structure achieves the adjustment of braking effect through two brake shoe blocks hinged on the hinge shaft fixed on the brake box, as well as adjusting components provided on the brake box on one side of the hinge shaft. In addition, the follow-up brake also has a lock that can lock the brake disc components, providing dust-proof and waterproof functions to ensure brake sensitivity
Standard
GB, DIN, ISO, JIS
Size
M3-M50 or non-standard as request&design
Material
Carbon steel, stainless steel, alloys steel etc.
Hex head bolt and nut Grade
4.8 / 6.8 / 8.8 / 10.9 / 12.9 ,
A2-70 / A4-80
Packing
Box, carton or plastic bags, then put on pallets, or according to the demand of the customers
Standard
DIN / GB / UNC / BSW /JIS etc.
Size
M3-M50 or non-standard as request&design
Material
Carbon steel, stainless steel, alloys steel etc.
Hex head bolt and nut Grade
4.8 8.8 10.9 12.9 A2-70 A4-70 A4-80 etc.
Packing
Box, carton or plastic bags, then put on pallets, or according to the demand of the customers
Standard
GB, DIN, ISO, JIS
Size
M3-M50 or non-standard as request&design
Material
Carbon steel, stainless steel, alloys steel etc.
Hex head bolt and nut Grade
4.8 / 6.8 / 8.8 / 10.9 / 12.9 ,
A2-70 / A4-80
Packing
Box, carton or plastic bags, then put on pallets, or according to the demand of the customers