For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when (1) we have
received your deposit, and (2) we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all
cases we will try to accommodate your needs. In most cases we are able to do so.
Product Name
U-bolt
Package
BAG/BOX
Grade
4.6,4.8,5.6,6.8,8.8,9.8,10.9,12.9,etc
Available Material
304 stainless steel,plastic,brass,carbon steel,titanium,aluminum,etc
Surface treatment
Zinc plated,Black oxide,Phosphate,Dacroment,etc
Standard
ISO,BS,ANSI, GB,DIN,JIS,Nonstandard
Advantage
OEM / ODM / customized service provided
Quality control
ISO standard,100% Whole range inspection through the production
Certificate
ISO9001,ISO14001,IATF16949,ROHS,etc
Structure of electric vehicle follow-up brake:
It mainly includes components such as brake box, two brake shoes, crank, reset spring, adjusting parts, tension column, etc. Specifically, the working principle of the follow-up brake is to increase the rotation angle of the two brake shoes during braking through the setting of metal plates and reels, thereby increasing the maximum braking resistance. This structure achieves the adjustment of braking effect through two brake shoe blocks hinged on the hinge shaft fixed on the brake box, as well as adjusting components provided on the brake box on one side of the hinge shaft. In addition, the follow-up brake also has a lock that can lock the brake disc components, providing dust-proof and waterproof functions to ensure brake sensitivity
Butterfly buckles and double ring buckles (also known as butterfly buckles, connecting rings, or linking rings) are mainly used to connect the chains, rings, and hooks in chain rigging. The design of this connecting ring allows for the pivot connection of a rotating ring body at each end of a connecting ring body. Its characteristic is that the body is a hollow cylindrical body, and the two rotating ring bodies are formed by a protruding embedded part at one end of a linear rod, and the other end is bent into a ring and then wound around a straight section for positioning.
Standard
GB, DIN, ISO, JIS
Size
M3-M50 or non-standard as request&design
Material
Carbon steel, stainless steel, alloys steel etc.
Hex head bolt and nut Grade
4.8 / 6.8 / 8.8 / 10.9 / 12.9 ,
A2-70 / A4-80
Packing
Box, carton or plastic bags, then put on pallets, or according to the demand of the customers
Standard
GB, DIN, ISO, JIS
Size
M3-M50 or non-standard as request&design
Material
Carbon steel, stainless steel, alloys steel etc.
Grade
4.8 / 6.8 / 8.8 / 10.9 / 12.9 ,
A2-70 / A4-80
Packing
Box, carton or plastic bags, then put on pallets, or according to the demand of the customers
item
connecting nut
Application
Heavy Industry, General Industry, Automotive Industry
Material
carbon steel, stainless steel
Size
M6 M8 M10 M12 M16
Packing
Cartons and pallets or according to customer’s requirements
Advantages:
Factory direct selling and competitive price
Delivery method:
Air, sea or express, such as EMS, UPS, TNT etc
Standard
GB, DIN, ISO, JIS
Size
M3-M50 or non-standard as request&design
Material
Carbon steel, stainless steel, alloys steel etc.
Grade
4.8 / 6.8 / 8.8 / 10.9 / 12.9 ,
A2-70 / A4-80
Packing
Box, carton or plastic bags, then put on pallets, or according to the demand of the customers
Product
Wheel / Lug Nut
Standard
ASTM / ANSI / ISO / DIN
Material
Carbon Steel, Stainless Steel, Alloy Steel
Mark
According to customer’s requirement
Size
Any size
Package
Cartons&pallets or according to customer’s requirement.
Materials:
Carbon steel, Stainless steel
Size:
Customized as per detailed sizes or drawings
MOQ:
1,000pcs above, depends on products or dimensions
Sample lead time:
3-7 working days mostly
Massive lead time:
10-15 working days mostly
Trade terms:
EXW/FOB/CIF/CNF/FCA/DAP/DDP/DDU
Package:
PE bags + brown carton + pallets or customized as demands